Case Studies
SUBSTATION PROJECTS
Providing innovative solutions for major electrical infrastructure projects.

Substation Projects Case Studies
Eltham Grid Auto Switching
Eltham Grid Auto Switching
Client(s): EDF Energy
Freedom was contracted by EDF Energy Networks division to design, supply, install and commission a 132kV auto switching system for Eltham Grid 132kV substation.
Witham Primary Substation Rebuild
Witham Primary Substation Rebuild
Client(s): EDF Energy Networks East
Emergency restoration works followed the catastrophic failure of an 11kV switchboard at Witham Primary Substation using temporary ring main units.
Girlington Transformer Replacement
Girlington Transformer Replacement
Client(s): YEDL
Freedom was contacted by Yorkshire Electricity Distribution Ltd when a 132/33kV Transformer at Girlington (Bradford) failed in service.
Page 2 of 2
