Case Studies

SUBSTATION PROJECTS

Providing innovative solutions for major electrical infrastructure projects.

Freedom News and Press

Substation Projects Case Studies

Freedom Group Case Study Freedom Group Case Study

Eltham Grid Auto Switching

Eltham Grid Auto Switching

Client(s): EDF Energy

Freedom was contracted by EDF Energy Networks division to design, supply, install and commission a 132kV auto switching system for Eltham Grid 132kV substation.

   
Freedom Group Case Study Freedom Group Case Study

Witham Primary Substation Rebuild

Witham Primary Substation Rebuild

Client(s): EDF Energy Networks East

Emergency restoration works followed the catastrophic failure of an 11kV switchboard at Witham Primary Substation using temporary ring main units.

   
Freedom Group Case Study Freedom Group Case Study

Girlington Transformer Replacement

Girlington Transformer Replacement

Client(s): YEDL

Freedom was contacted by Yorkshire Electricity Distribution Ltd when a 132/33kV Transformer at Girlington (Bradford) failed in service.

   

Page 2 of 2