Case Study Icon

Barford-Bourne-Madingley Tee

CASE STUDY: Overhead Power Distribution Systems

Freedom played a key part in the design of this bespoke ‘Compacted Covered Conductor’ (CCC) system for EDF Energy.

Client(s) EDF Energy
Location Cambridgeshire
Project Start Date Autumn 2004
Project Completion Date Summer 2005

With particular attention paid to the harsh coastal environment, approximately 7km of 33kV overhead line was replaced using 120mm CCC conductor with and post type insulators.

Freedom’s own wayleave surveyors obtained all landowner wayleaves, Local Authority planning and DTI Section 37 consent.

The project scope required the replacement of 57 intermediate poles, 9 section poles, 1 H-pole and all stays. Specialist soil stabilisation techniques were employed to ensure the stability of the poles in marshland.

Return to Case Studies

PDF  Print  E-mail