Case Studies

SUBSTATION PROJECTS

Providing innovative solutions for major electrical infrastructure projects.

Freedom News and Press

Substation Projects Case Studies

Freedom Group Case Study Freedom Group Case Study

Colchester Grid works

Colchester Grid works

Client(s): Edf Energy Networks

EDF Energy approached Freedom with the view to increasing supply capacity at Colchester Grid substation in Essex. The Freedom design team, under the Professional Services Contract with EDF Energy, presented the option of increasing the 2 original 132kV/33kV 45MVA transformers with new 90MVA units.

   
Freedom Group Case Study Freedom Group Case Study

Osborn Street Substation

Osborn Street Substation

Client(s): EDF Energy Networks

Complete design, manage, build and commission of new 132/11kV Grid Supply point substation including all civil / structural design, primary electrical design, control and protection systems design, overall Project Management of design process and role of Principal Contractor.

   
Freedom Group Case Study Freedom Group Case Study

Wold Newton 132/33kV Substation

Wold Newton 132/33kV Substation

Client(s): YEDL

Freedom were contracted by YEDL to design and manufacture a suite of 132kV and 33kV protection panels required for a major upgrade to this substation.

   
Freedom Group Case Study Freedom Group Case Study

11kV Switchgear Replacement

11kV Switchgear Replacement

Client(s): EDF Energy Networks

Over the past 10 years EDF Energy Networks have made significant investments in the renewal of the expired 11Kv switchgear assets and the installation of automated switchgear units.

   
Freedom Group Case Study Freedom Group Case Study

Central Welwyn 11KV Switchboard Replacement

Central Welwyn 11KV Switchboard Replacement

Client(s): EDF Energy Networks East

The scope of works required the replacement of an 11kV switchboard including a temporary replacement board with ring main units.

   
Freedom Group Case Study Freedom Group Case Study

Wavertree 132/33kV Substation

Wavertree 132/33kV Substation

Client(s): ScottishPower (Manweb)

Scottish Power were requested to provide a customer connection point that required the upgrading of the network at Wavertree Substation.

   
Freedom Group Case Study Freedom Group Case Study

Saltney 132kV Substation

Saltney 132kV Substation

Client(s): ScottishPower (Manweb)

Scottish Power were required to complete the replacement of the assets at Saltney due to the substation being time expired and requiring an unusual running arrangement to provide power to one of the connected customers.

   
Freedom Group Case Study Freedom Group Case Study

Eltham Grid Auto Switching

Eltham Grid Auto Switching

Client(s): EDF Energy

Freedom was contracted by EDF Energy Networks division to design, supply, install and commission a 132kV auto switching system for Eltham Grid 132kV substation.

   
Freedom Group Case Study Freedom Group Case Study

Witham Primary Substation Rebuild

Witham Primary Substation Rebuild

Client(s): EDF Energy Networks East

Emergency restoration works followed the catastrophic failure of an 11kV switchboard at Witham Primary Substation using temporary ring main units.

   
Freedom Group Case Study Freedom Group Case Study

Girlington Transformer Replacement

Girlington Transformer Replacement

Client(s): YEDL

Freedom was contacted by Yorkshire Electricity Distribution Ltd when a 132/33kV Transformer at Girlington (Bradford) failed in service.