Case Study Icon

Power Fence Installation

CASE STUDY: Consultancy Services

Freedom have been employed to design, install, commission and maintain power fence security installations in the NEDL and YEDL areas of CE Electric UK.

Client(s) CE Electric UK
Location Sites throughout NEDL and YEDL
Project Start Date Rolling annual programme
Project Completion Date Ongoing

Freedom have been employed to design, install, commission and maintain power fence security installations in the NEDL and YEDL areas of CE Electric UK.

"

Freedoms design and installation methods for open compounds allow works to be carried out without the need for system outages.

"

The work comprises the installation of a 3.00m high Gallagher Power Fence System to existing 2.40m high palisade fencing. The system is controlled by a Galaxy integrated security control panel allowing integration of site security and fire alarm systems.

The works are mainly carried out to perimeter fencing round open busbar compound substations but are also installed to high risk substation sites.

Freedoms design and installation methods for open compounds allow works to be carried out without the need for system outages.

Return to Case Studies

PDF  Print  E-mail