Case Studies
CIVIL ASSET MANAGEMENT
Offering value added planned and reactive / emergency services relating to the specialist care of operational facilities.

Civil Asset Management Case Studies
Creation of Vocational Training School
Creation of Vocational Training School
Client(s): Distribution and Private Network Owners, staff and tradesmen
Refurbishment of an existing commercial property, to create a vocational training school in Corby, 77,000 sq ft within 8 acres of land.
Inspection and Maintenance of Civil Assets
Inspection and Maintenance of Civil Assets
Client(s): EDF Energy Networks
The provision of services for the inspection and undertaking the maintenance of building and civil assets including key associated management functions.
Temporary Edge Protection
Temporary Edge Protection
Client(s): All
Originally the requirement was for a specific contract, however considering the number of times Freedom have carried out roof work it was soon apparent that the system could be used anywhere that minor work on a flat roof was being carried out.
Civil Asset and Building Maintenance Contract
Civil Asset and Building Maintenance Contract
Client(s): CE Electric UK
The scope currently covers the repair and maintenance and asset replacement covering all building trades on 17,000 sub-stations in the YEDL Area.
Lone Working
Lone Working
Client(s): CE Electric (NEDL)
To answer client concerns about ‘Lone Worker’ Health and Safety Issues when tendering for NEDL Grounds Maintenance Contract, Freedom developed and utilised existing mobile phone technology to monitor and record single worker whereabouts.
Staircase to Control and Battery Rooms Replacement
Staircase to Control and Battery Rooms Replacement
Client(s): EDF Energy
Our brief was to safely remove the old staircase and remove from site and reinstate with new galvanised stair in accordance with the new fire escape regulations.
No-Dig Solution
No-Dig Solution
Client(s): EDF Energy (and others)
The project was required in order to eliminate and eradicate ‘cable strikes’ and accidents attributable directly to digging and excavations.
Austin Cannons Grid & Primary Substation
Austin Cannons Grid & Primary Substation
Client(s): EDF Energy Networks
The fencing and security arrangements at Austin Cannons Grid and Primary at Kempston near Bedford were in urgent need of attention.
Site Surveys
Site Surveys
Client(s): Various Grid & Primary Sub-Stations
Freedom were tasked with conducting 30 Site Surveys for Central Network over a 6 week period.