Case Studies

CIVIL ASSET MANAGEMENT

Offering value added planned and reactive / emergency services relating to the specialist care of operational facilities.

Freedom News and Press

Civil Asset Management Case Studies

Freedom Group Case Study Freedom Group Case Study

Creation of Vocational Training School

Creation of Vocational Training School

Client(s): Distribution and Private Network Owners, staff and tradesmen

Refurbishment of an existing commercial property, to create a vocational training school in Corby, 77,000 sq ft within 8 acres of land.

   
Freedom Group Case Study Freedom Group Case Study

Inspection and Maintenance of Civil Assets

Inspection and Maintenance of Civil Assets

Client(s): EDF Energy Networks

The provision of services for the inspection and undertaking the maintenance of building and civil assets including key associated management functions.

   
Freedom Group Case Study Freedom Group Case Study

Temporary Edge Protection

Temporary Edge Protection

Client(s): All

Originally the requirement was for a specific contract, however considering the number of times Freedom have carried out roof work it was soon apparent that the system could be used anywhere that minor work on a flat roof was being carried out.

   
Freedom Group Case Study Freedom Group Case Study

Civil Asset and Building Maintenance Contract

Civil Asset and Building Maintenance Contract

Client(s): CE Electric UK

The scope currently covers the repair and maintenance and asset replacement covering all building trades on 17,000 sub-stations in the YEDL Area.

   
Freedom Group Case Study Freedom Group Case Study

Lone Working

Lone Working

Client(s): CE Electric (NEDL)

To answer client concerns about ‘Lone Worker’ Health and Safety Issues when tendering for NEDL Grounds Maintenance Contract, Freedom developed and utilised existing mobile phone technology to monitor and record single worker whereabouts.

   
Freedom Group Case Study Freedom Group Case Study

Staircase to Control and Battery Rooms Replacement

Staircase to Control and Battery Rooms Replacement

Client(s): EDF Energy

Our brief was to safely remove the old staircase and remove from site and reinstate with new galvanised stair in accordance with the new fire escape regulations.

   
Freedom Group Case Study Freedom Group Case Study

No-Dig Solution

No-Dig Solution

Client(s): EDF Energy (and others)

The project was required in order to eliminate and eradicate ‘cable strikes’ and accidents attributable directly to digging and excavations.

   
Freedom Group Case Study Freedom Group Case Study

Austin Cannons Grid & Primary Substation

Austin Cannons Grid & Primary Substation

Client(s): EDF Energy Networks

The fencing and security arrangements at Austin Cannons Grid and Primary at Kempston near Bedford were in urgent need of attention.

   
Freedom Group Case Study Freedom Group Case Study

Site Surveys

Site Surveys

Client(s): Various Grid & Primary Sub-Stations

Freedom were tasked with conducting 30 Site Surveys for Central Network over a 6 week period.