Case Studies

Our "end to end" approach brings benefits to our clients.

The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Case Studies

Latest Case Studies

Freedom Group Case Study Freedom Group Case Study

Overhead Line Services Contract

Client(s): EDF Energy Networks

Design, Manage, Build and Commission, Turnkey contract to deliver capital overhead line construction, Substation and maintenance delivery.

   
Freedom Group Case Study Freedom Group Case Study

Penrhyn Hill

Client(s): Conwy County Burough Council

Penrhyn Hill is a split level Dual Carriageway which passes through a rock mountain which inevitably made new installations a challenge.

   
Freedom Group Case Study Freedom Group Case Study

Street Lighting Replacement

Client(s): Corus

NWP Power Systems (part of Freedom) were successful in winning this contract which involved the removal of 8metre concrete columns which had surpassed their life expectancy. The new lighting scheme consisted of galvanised steel lighting columns complete with Son-T lanterns.

   
Freedom Group Case Study Freedom Group Case Study

Inspection and Maintenance of Civil Assets

Client(s): EDF Energy Networks

The provision of services for the inspection and undertaking the maintenance of building and civil assets including key associated management functions.

   
Freedom Group Case Study Freedom Group Case Study

Mirfield Substation Flood Defence Scheme

Client(s): CE Electric

The existing Mirfield substation was identified by YEDL Environmental Consultants as being within a flood plain and liable to 1 in 100 year extreme flood levels. Freedom prepared a scheme design for construction of reinforced concrete flood defence walls.

   
Freedom Group Case Study Freedom Group Case Study

Annual maintenance for Harrods Ltd

Client(s): Harrods Ltd

Annual maintenance to all HV and LV power equipment for Harrods Ltd. Major High Voltage and Low Voltage modifications to the stores 20MW distribution supply. This involved working out of store hours, mainly at night and Sundays.

   
Freedom Group Case Study Freedom Group Case Study

Bicker Fen 33kV Wind Farm

Client(s): R.G. Carter Engineering

Freedom was responsible for the design and delivery of the ‘on site’ 33kV network to 13 x RE Power 2MW wind turbines (26MWe Total Output). This included the design and construction of the wind farm brick built substation building.

   
Freedom Group Case Study Freedom Group Case Study

Temporary Edge Protection

Client(s): All

Originally the requirement was for a specific contract, however considering the number of times Freedom have carried out roof work it was soon apparent that the system could be used anywhere that minor work on a flat roof was being carried out.

   
Freedom Group Case Study Freedom Group Case Study

Maintenance of HV Electrical Assets

Client(s): Chelsea Football Club

Freedom were appointed by Chelsea FC in 2006 to service, maintain and repair their electrical distribution equipment and plant. These works involve 6 monthly visits to site to undertake sub-station inspection.

   
Freedom Group Case Study Freedom Group Case Study

HV Network Upgrade

Client(s): University Of Birmingham

The scope of works was to upgrade part of the existing HV network including providing the provision of a new substation, the civil and trenching works and the installation of HV cabling to strengthen the existing HV network ring.

   

Page 2 of 6