Case Studies

Our "end to end" approach brings benefits to our clients.

The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Case Studies

Latest Case Studies

Freedom Group Case Study Freedom Group Case Study

Staircase to Control and Battery Rooms Replacement

Client(s): EDF Energy

Our brief was to safely remove the old staircase and remove from site and reinstate with new galvanised stair in accordance with the new fire escape regulations.

   
Freedom Group Case Study Freedom Group Case Study

Girlington Transformer Replacement

Client(s): YEDL

Freedom was contacted by Yorkshire Electricity Distribution Ltd when a 132/33kV Transformer at Girlington (Bradford) failed in service.

   
Freedom Group Case Study Freedom Group Case Study

No-Dig Solution

Client(s): EDF Energy (and others)

The project was required in order to eliminate and eradicate ‘cable strikes’ and accidents attributable directly to digging and excavations.

   
Freedom Group Case Study Freedom Group Case Study

Austin Cannons Grid & Primary Substation

Client(s): EDF Energy Networks

The fencing and security arrangements at Austin Cannons Grid and Primary at Kempston near Bedford were in urgent need of attention.

   
Freedom Group Case Study Freedom Group Case Study

Site Surveys

Client(s): Various Grid & Primary Sub-Stations

Freedom were tasked with conducting 30 Site Surveys for Central Network over a 6 week period.

   
Freedom Group Case Study Freedom Group Case Study

Llandudno Promenade

Client(s): Conwy County Borough Council

The Street Lighting Division of NWP Power Systems (part of Freedom) was awarded a contract to refurbish approximately 90 Cast Iron Street Lighting Columns.

   
Freedom Group Case Study Freedom Group Case Study

Bambers Wind Farm

Client(s): Ecotricity

Freedom was able to call on their vast experience in order to interpret the requirements of the Grid Connection, to design 33kV infrastructure capable of accepting a demand of nearly 10MVA.

   
Freedom Group Case Study Freedom Group Case Study

Burton Wold 33kV Wind Farm

Client(s): Enercon

The project involved a full turnkey package for the connection of a 20MW wind farm at Burton Wold using 400mm2 Copper conductors, 33KV XLPE single core cables ducted over a route length of 3Km.

   