Case Studies

Our "end to end" approach brings benefits to our clients.

The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Case Studies

Latest Case Studies

Freedom Group Case Study Freedom Group Case Study

Fen Farm Wind Farm

Client(s): Ecotricty

Freedom have just completed the sixth wind farm site with strategic partners Ecotricity, with the connection to the Grid of their largest Wind Farm to date.

   
Freedom Group Case Study Freedom Group Case Study

Ford Motor Company Wind Turbine

Client(s): Ecotricity

The project involved installing the network and connecting the two wind turbines onto Ford’s 11kV Network.

   
Freedom Group Case Study Freedom Group Case Study

Red Tile Wind Farm

Client(s): EDF Energy

Red Tile Wind Farm was developed by EDF Energy Nouvelles of France and has 12 x 2MW RePower turbines.

   
Freedom Group Case Study Freedom Group Case Study

Wold Newton 132/33kV Substation

Client(s): YEDL

Freedom were contracted by YEDL to design and manufacture a suite of 132kV and 33kV protection panels required for a major upgrade to this substation.

   
Freedom Group Case Study Freedom Group Case Study

11kV Switchgear Replacement

Client(s): EDF Energy Networks

Over the past 10 years EDF Energy Networks have made significant investments in the renewal of the expired 11Kv switchgear assets and the installation of automated switchgear units.

   
Freedom Group Case Study Freedom Group Case Study

Central Welwyn 11KV Switchboard Replacement

Client(s): EDF Energy Networks East

The scope of works required the replacement of an 11kV switchboard including a temporary replacement board with ring main units.

   
Freedom Group Case Study Freedom Group Case Study

Wavertree 132/33kV Substation

Client(s): ScottishPower (Manweb)

Scottish Power were requested to provide a customer connection point that required the upgrading of the network at Wavertree Substation.

   
Freedom Group Case Study Freedom Group Case Study

Saltney 132kV Substation

Client(s): ScottishPower (Manweb)

Scottish Power were required to complete the replacement of the assets at Saltney due to the substation being time expired and requiring an unusual running arrangement to provide power to one of the connected customers.

   
Freedom Group Case Study Freedom Group Case Study

Eltham Grid Auto Switching

Client(s): EDF Energy

Freedom was contracted by EDF Energy Networks division to design, supply, install and commission a 132kV auto switching system for Eltham Grid 132kV substation.

   
Freedom Group Case Study Freedom Group Case Study

Witham Primary Substation Rebuild

Client(s): EDF Energy Networks East

Emergency restoration works followed the catastrophic failure of an 11kV switchboard at Witham Primary Substation using temporary ring main units.

   

Page 5 of 6