Case Studies

Our "end to end" approach brings benefits to our clients.

The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Case Studies

Latest Case Studies

Freedom Group Case Study Freedom Group Case Study

Wold Newton 132/33kV Substation

Client(s): YEDL

Freedom were contracted by YEDL to design and manufacture a suite of 132kV and 33kV protection panels required for a major upgrade to this substation.

   
Freedom Group Case Study Freedom Group Case Study

11kV Switchgear Replacement

Client(s): EDF Energy Networks

Over the past 10 years EDF Energy Networks have made significant investments in the renewal of the expired 11Kv switchgear assets and the installation of automated switchgear units.

   
Freedom Group Case Study Freedom Group Case Study

Central Welwyn 11KV Switchboard Replacement

Client(s): EDF Energy Networks East

The scope of works required the replacement of an 11kV switchboard including a temporary replacement board with ring main units.

   
Freedom Group Case Study Freedom Group Case Study

Wavertree 132/33kV Substation

Client(s): ScottishPower (Manweb)

Scottish Power were requested to provide a customer connection point that required the upgrading of the network at Wavertree Substation.

   
Freedom Group Case Study Freedom Group Case Study

Saltney 132kV Substation

Client(s): ScottishPower (Manweb)

Scottish Power were required to complete the replacement of the assets at Saltney due to the substation being time expired and requiring an unusual running arrangement to provide power to one of the connected customers.

   
Freedom Group Case Study Freedom Group Case Study

Eltham Grid Auto Switching

Client(s): EDF Energy

Freedom was contracted by EDF Energy Networks division to design, supply, install and commission a 132kV auto switching system for Eltham Grid 132kV substation.

   
Freedom Group Case Study Freedom Group Case Study

Witham Primary Substation Rebuild

Client(s): EDF Energy Networks East

Emergency restoration works followed the catastrophic failure of an 11kV switchboard at Witham Primary Substation using temporary ring main units.

   
Freedom Group Case Study Freedom Group Case Study

Freedom Vegetation Management

Client(s): Multiple clients

Tree caused outages are one of the major causes of service interruptions. Only a very specific plan which incorporates tree ecology can produce sustained reductions in tree caused outages.

   
Freedom Group Case Study Freedom Group Case Study

Staircase to Control and Battery Rooms Replacement

Client(s): EDF Energy

Our brief was to safely remove the old staircase and remove from site and reinstate with new galvanised stair in accordance with the new fire escape regulations.

   
Freedom Group Case Study Freedom Group Case Study

Girlington Transformer Replacement

Client(s): YEDL

Freedom was contacted by Yorkshire Electricity Distribution Ltd when a 132/33kV Transformer at Girlington (Bradford) failed in service.

   

Page 5 of 6