Case Studies
Our "end to end" approach brings benefits to our clients.
The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Latest Case Studies
Fen Farm Wind Farm
Client(s): Ecotricty
Freedom have just completed the sixth wind farm site with strategic partners Ecotricity, with the connection to the Grid of their largest Wind Farm to date.
Ford Motor Company Wind Turbine
Client(s): Ecotricity
The project involved installing the network and connecting the two wind turbines onto Ford’s 11kV Network.
Red Tile Wind Farm
Client(s): EDF Energy
Red Tile Wind Farm was developed by EDF Energy Nouvelles of France and has 12 x 2MW RePower turbines.
Wold Newton 132/33kV Substation
Client(s): YEDL
Freedom were contracted by YEDL to design and manufacture a suite of 132kV and 33kV protection panels required for a major upgrade to this substation.
11kV Switchgear Replacement
Client(s): EDF Energy Networks
Over the past 10 years EDF Energy Networks have made significant investments in the renewal of the expired 11Kv switchgear assets and the installation of automated switchgear units.
Central Welwyn 11KV Switchboard Replacement
Client(s): EDF Energy Networks East
The scope of works required the replacement of an 11kV switchboard including a temporary replacement board with ring main units.
Wavertree 132/33kV Substation
Client(s): ScottishPower (Manweb)
Scottish Power were requested to provide a customer connection point that required the upgrading of the network at Wavertree Substation.
Saltney 132kV Substation
Client(s): ScottishPower (Manweb)
Scottish Power were required to complete the replacement of the assets at Saltney due to the substation being time expired and requiring an unusual running arrangement to provide power to one of the connected customers.
Eltham Grid Auto Switching
Client(s): EDF Energy
Freedom was contracted by EDF Energy Networks division to design, supply, install and commission a 132kV auto switching system for Eltham Grid 132kV substation.
Witham Primary Substation Rebuild
Client(s): EDF Energy Networks East
Emergency restoration works followed the catastrophic failure of an 11kV switchboard at Witham Primary Substation using temporary ring main units.
Page 5 of 6