Case Studies

Our "end to end" approach brings benefits to our clients.

The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Case Studies

Latest Case Studies

Freedom Group Case Study Freedom Group Case Study

Switchgear Replacement Project

Client(s): Milton Keynes General Hospital

Freedom replaced the 11kv switchgear in substations 1, 2, 2a, 3, 5 & 6 with new Schneider Ringmaster range. Each substation had to have the switchgear changed with the minimum disruption to the hospital and whilst the hospital carried on work as usual.

   
Freedom Group Case Study Freedom Group Case Study

Civil Asset and Building Maintenance Contract

Client(s): CE Electric UK

The scope currently covers the repair and maintenance and asset replacement covering all building trades on 17,000 sub-stations in the YEDL Area.

   
Freedom Group Case Study Freedom Group Case Study

Lone Working

Client(s): CE Electric (NEDL)

To answer client concerns about ‘Lone Worker’ Health and Safety Issues when tendering for NEDL Grounds Maintenance Contract, Freedom developed and utilised existing mobile phone technology to monitor and record single worker whereabouts.

   
Freedom Group Case Study Freedom Group Case Study

Killamarsh

Client(s): Central Networks / IUS

When Central Networks had problems with the quality and reliability of their supply of electricity to a North East Derbyshire village, it was the franchise teams of Freedom who were called to the rescue.

   
Freedom Group Case Study Freedom Group Case Study

Barford-Bourne-Madingley Tee

Client(s): EDF Energy

Freedom played a key part in the design of this bespoke ‘Compacted Covered Conductor’ (CCC) system for EDF Energy.

   
Freedom Group Case Study Freedom Group Case Study

Tree Top Farm Substation

Client(s): United Utilities Electricity Services Ltd

Removing all trees that are or have the potential of breeching the overhead electricity power lines in the Manchester area.

   
Freedom Group Case Study Freedom Group Case Study

Dymchurch 33kV Upgrade

Client(s): EDF Energy (SPN)

Freedom played a key part in the design of this bespoke ‘Compacted Covered Conductor’ (CCC) system for EDF Energy.

   
Freedom Group Case Study Freedom Group Case Study

Tower Condition Monitoring

Client(s): ScottishPower Power Systems

The project involved a detailed visual inspection of every Tower and the production of a report on Circuit including multiple high quality digital photographs of every tower and any issues were highlighted and graded by severity.

   
Freedom Group Case Study Freedom Group Case Study

Whitehall Road 33/11kV Substation

Client(s): CE Electric UK

The Whitehall Road project involved the construction of a new 33/11kV primary substation to reinforce the increased load for Leeds City Centre developments. The project was constructed on an existing restricted substation site adjacent to a new Novotel Hotel.

   
Freedom Group Case Study Freedom Group Case Study

Catterick Reinforcement

Client(s): Siemens PT&D

The Catterick Reinforcement project comprised the construction of a new 132/11kV substation at Richmond Skeeby to reinforce the supply to the MOD bases around Catterick.

   