Case Studies
Our "end to end" approach brings benefits to our clients.
The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Latest Case Studies
Switchgear Replacement Project
Client(s): Milton Keynes General Hospital
Freedom replaced the 11kv switchgear in substations 1, 2, 2a, 3, 5 & 6 with new Schneider Ringmaster range. Each substation had to have the switchgear changed with the minimum disruption to the hospital and whilst the hospital carried on work as usual.
Civil Asset and Building Maintenance Contract
Client(s): CE Electric UK
The scope currently covers the repair and maintenance and asset replacement covering all building trades on 17,000 sub-stations in the YEDL Area.
Lone Working
Client(s): CE Electric (NEDL)
To answer client concerns about ‘Lone Worker’ Health and Safety Issues when tendering for NEDL Grounds Maintenance Contract, Freedom developed and utilised existing mobile phone technology to monitor and record single worker whereabouts.
Killamarsh
Client(s): Central Networks / IUS
When Central Networks had problems with the quality and reliability of their supply of electricity to a North East Derbyshire village, it was the franchise teams of Freedom who were called to the rescue.
Read More View all Underground Power Distribution Systems case studies
Barford-Bourne-Madingley Tee
Client(s): EDF Energy
Freedom played a key part in the design of this bespoke ‘Compacted Covered Conductor’ (CCC) system for EDF Energy.
Read More View all Overhead Power Distribution Systems case studies
Tree Top Farm Substation
Client(s): United Utilities Electricity Services Ltd
Removing all trees that are or have the potential of breeching the overhead electricity power lines in the Manchester area.
Read More View all Overhead Power Distribution Systems case studies
Dymchurch 33kV Upgrade
Client(s): EDF Energy (SPN)
Freedom played a key part in the design of this bespoke ‘Compacted Covered Conductor’ (CCC) system for EDF Energy.
Read More View all Overhead Power Distribution Systems case studies
Tower Condition Monitoring
Client(s): ScottishPower Power Systems
The project involved a detailed visual inspection of every Tower and the production of a report on Circuit including multiple high quality digital photographs of every tower and any issues were highlighted and graded by severity.
Whitehall Road 33/11kV Substation
Client(s): CE Electric UK
The Whitehall Road project involved the construction of a new 33/11kV primary substation to reinforce the increased load for Leeds City Centre developments. The project was constructed on an existing restricted substation site adjacent to a new Novotel Hotel.
Catterick Reinforcement
Client(s): Siemens PT&D
The Catterick Reinforcement project comprised the construction of a new 132/11kV substation at Richmond Skeeby to reinforce the supply to the MOD bases around Catterick.
Page 3 of 6
