The case studies featured here illustrate Freedom’s work from the replacement of a domestic fuse, to a major design and substation build development.

Case Studies

Latest Case Studies

Freedom Group Case Study Freedom Group Case Study

Rayleigh 132kV GIS Substation

Client(s): Siemens PT&D for EDF Energy

This project involved Freedom in the civil and structural engineering design for a new 132kV Gas Insulated Switchgear type substation at Rayleigh for EDF Energy. The building design is two storey steel framed with insulated profiled steel cladding and in-situ reinforced concrete first floor.

   
Freedom Group Case Study Freedom Group Case Study

Neepsend Emergency River Bank Repairs

Client(s): CE Electric

Heavy seasonal rainfall caused the river bank to erode exposing 3 x 33kV oil filled cables and 2 x 11kV cables.

   
Freedom Group Case Study Freedom Group Case Study

LV Pole Replacement

Client(s): CE Electric

CE Electric has recently issued an extension to our LV Pole Replacement Works following continued excellent performance.

   
Freedom Group Case Study Freedom Group Case Study

Power Fence Installation

Client(s): CE Electric UK

Freedom have been employed to design, install, commission and maintain power fence security installations in the NEDL and YEDL areas of CE Electric UK. The work comprises the installation of a 3.00m high Gallagher Power Fence System to existing 2.40m high palisade fencing.

   
Freedom Group Case Study Freedom Group Case Study

Kearsley 132kV GIS Substation

Client(s): Siemens for United Utilities

This particular project was awarded by United Utilities to Siemens PT&D following an extensive tender process. Freedom assisted Siemens with the proposed design during the tender process and was notated as Civil Designers to the civil construction company.

   
Freedom Group Case Study Freedom Group Case Study

Sparling Street 132/33kV Substation

Client(s): Siemens Power Transmission Distribution (PT&D)

The Sparling Street project involved a new 132/33 kV substation in the centre of Liverpool to supply the new £400m Paradise Street redevelopment.

   
Freedom Group Case Study Freedom Group Case Study

Elland Substation rebuild

Client(s): CE Electric

Freedom was awarded the contract from CE Electric for the rebuild of YEDL’s 132 KV grid supply substation at Elland, West Yorkshire. The project involved the demolition and rebuild of 17 circuits of air insulated switchgear on a phased programme over a four year period.

   
Freedom Group Case Study Freedom Group Case Study

Chevin End Substation

Client(s): CE Electric

Freedom were working for YEDL in providing Engineering Projects under a Framework Consultancy contract providing civil design, structural engineering, quantity surveying and project management services.

   
Freedom Group Case Study Freedom Group Case Study

Barugh 66/11KV Substation

Client(s): YEDL

Freedom were awarded a contract for Civil & Electrical design engineering, site installation and commissioning works associated with the redevelopment of Barugh 66/11kV substation, located in South Yorkshire.

   
Freedom Group Case Study Freedom Group Case Study

Wind Turbine, B&Q Warehouse

Client(s): Ecotricity

As part of their ‘Merchant Wind’ offering, Ecotricity have installed a single 2MWe Enercon E82 turbine at the rear of the B & Q site in Worksop.

   